Project Details

Sincik RES – 27,5 MW

Sincik, Adıyaman02.12.2010

  • Project StatusYürürlükte
  • Installed Power27,5 MW
  • Turbine TypeNordex GmbH / N100 - 2,5 MW
  • Year of Construction2014

The Sincik Wind Power Plant is located in the Sincik District of Adıyaman and is operated by Tektuğ Electricity. Following an application made in November 2007, the project received a production license from the Energy Market Regulatory Authority (EPDK) on October 2, 2010. This project is one of the first to obtain a license for electricity generation from wind energy in Turkey.

Construction of the project began in March 2012, utilizing 11 Nordex wind turbines. The Sincik Basin 154 kV transformer served as the connection point for the project, and the construction of the facility was successfully completed, with operations commencing in January 2014. The project has an installed capacity of 25 MWe, which can meet the daily electricity needs of approximately 15,463 residents in Adıyaman.

Additionally, a hybrid solar energy project has been initiated at the Sincik WPP site, with a solar plant investment of 9.8489 MWm capacity. Through these projects, Sincik WPP contributes to environmentally friendly electricity generation by harnessing both wind and solar energy.