Kalealtı II HES – 14,24 MW

Savrun Stream, Kadirli, Osmaniye29.07.2010

  • Project StatusYürürlükte
  • Installed Power14,24 MW
  • Turbine TypeYatay Francis
  • Year of Construction2014

The Kalealtı II HPP Project, under Tektuğ Elektrik Üretim A.Ş., is located on the Savrun Stream, a tributary of the Ceyhan River in the Mediterranean Region. This project, situated near Kalealtı II Neighborhood in the Kadirli District of Osmaniye Province, has seen significant contributions from our sister organization, Çiltuğ Isı San. ve Tic. A.Ş.

Construction activities for the Kalealtı II HPP project began in April 2011 after obtaining the necessary permits. The project includes the successful completion of the regulator structure, a 2,512-meter transmission tunnel, a 452-meter transmission channel, a loading pool, a 650-meter pressure pipe, and the power plant building. The plant was commissioned in March 2014.